Buildings & Drawing-Derived Geometry
No buildings yet. Add one above, then import or manually verify its geometry to create surfaces and opportunities.
Portfolio Summary (0 of 0 opportunities included)
No opportunities are currently included in the financial rollup.
Scenario Comparison: Conventional vs BIPV
| Metric | Conventional cladding | BIPV |
|---|
| Initial installed cost | ₹0 | ₹0 |
| Energy generation (yr 1) | 0 kWh | 0 kWh |
| Avoided conventional cost | — | ₹0 |
| Incremental investment | — | ₹0 |
| Annual energy value (yr 1) | ₹0 | ₹0 |
| Payback | — | Never within project life |
| Lifetime energy | 0 kWh | 0 kWh |
Assumptions & data-quality warnings
- ⚠Project assumption "Electricity tariff (₹/kWh)" is not set - using a platform default (8).
- ⚠Project assumption "Tariff escalation (%/yr)" is not set - using a platform default (3).
- ⚠Project assumption "Self-consumption (%)" is not set - using a platform default (100).
- ⚠Project assumption "Export tariff (₹/kWh)" is not set - using a platform default (4).
- ⚠Project assumption "Discount rate (%)" is not set - using a platform default (8).
- ⚠Project assumption "Project life (years)" is not set - using a platform default (25).
- ⚠Project assumption "O&M cost (₹/kWp/yr)" is not set - using a platform default (500).
- ⚠Project assumption "O&M escalation (%/yr)" is not set - using a platform default (3).
- ⚠Project assumption "Incentives (lump sum)" is not set - using a platform default (0).